TechMathsData center engineering
Engineers available this weekLisbon HQ · Europe · UK · US · India

Hands-on data centerengineering, anywhereyou build.

We build racks, pull and certify cable, install and configure servers and networks, commission the result and stay on call afterwards. One accountable crew, from survey to signed handover.

countries covered
28
countries covered
field engineers
60+
field engineers
quote response
4h
quote response
emergency hands
2h
emergency hands

28

countries covered

illustrative

380+

projects delivered

illustrative

60+

field engineers

illustrative

4h

average quote response

illustrative

  • ESD-controlled crews

    ANSI/ESD S20.20 handling on every site

  • Certified cabling

    100% link certification with native test exports

  • Documented handover

    As-builts, asset register and evidence pack

  • Insured & vetted

    Public liability, background checks, site inductions

Colocation operatorHyperscale providerTelecom operatorManaged service providerFinancial servicesHardware vendorEdge platformSystem integratorColocation operatorHyperscale providerTelecom operatorManaged service providerFinancial servicesHardware vendorEdge platformSystem integrator

Service catalogue

Nine services.
One delivery standard.

Every service is delivered by the same crews, to the same documentation standard, with the same quality gates — whether it is a single rack in Porto or a hall in Frankfurt.

How a deployment works

From brief to signed handover,
with a gate at every stage.

Eight stages, each with defined outputs and a quality gate. Nothing moves to the next stage until the current one is complete and recorded.

  1. 01

    Brief

    Day 0

    You send the hardware list, the drawings you have and the deadline. We ask the questions that decide feasibility.

    We confirm site access windows, power and cooling readiness, security and induction requirements, and whether the scope is a build, a migration or a mixed programme. Anything ambiguous is resolved here, in writing, before a price is issued.

    • Scope confirmation
    • Access and security requirements
    • Indicative pricing within 4 business hours

    Scope signed off before mobilisation planning starts.

  2. 02

    Survey

    Day 1–3

    A site visit or a structured remote survey. We measure what is actually there, not what the drawing says.

    Rack space, containment capacity, power feeds and phases, cooling behaviour, cable routes, lifting and access constraints, and the state of anything we have to work around. Remote surveys use a guided checklist with your site team when travel is not justified.

    • Site survey report
    • Risk and constraint register
    • Route and containment assessment

    Constraints logged and priced — no surprises left for the floor.

  3. 03

    Plan

    Day 3–7

    Rack elevations, cable schedules, port maps and a sequenced programme you can approve line by line.

    The plan is the deliverable that keeps the project honest: what goes where, in which order, by whom, with which tests at which point. Change after this point goes through a documented change record rather than an informal conversation.

    • Rack elevations and cable schedule
    • Port map and addressing plan
    • Programme with milestones and dependencies

    Plan approved and baselined before mobilisation.

  4. 04

    Mobilise

    Day 7+

    Crews, tooling, spares and logistics in place — including inductions, permits and site-specific briefings.

    Engineers are briefed on the plan and the site before they arrive. Tooling is calibrated, ESD equipment checked, and any local access or licensing requirements arranged in advance so the first day on the floor is spent building, not waiting.

    • Named crew and schedule
    • Calibrated tooling and ESD kits
    • Access, permits and inductions confirmed

    Crew briefed and inducted before first touch of live equipment.

  5. 05

    Execute

    Per programme

    The build: racks, cable, hardware, OS, network. Daily progress against plan, deviations logged as they happen.

    Work runs in batches so specification faults surface on the first units rather than the last hundred. Daily reports cover completed work, blockers and deviations. Nothing is silently re-planned: if reality disagrees with the plan, you hear about it the same day.

    • Daily progress report
    • Deviation log with approvals
    • Work-in-progress photo record

    Daily quality check by the lead engineer before the crew signs off.

  6. 06

    Test

    Per programme

    Certification and acceptance testing, including deliberate fault injection to prove redundancy claims.

    Copper and fibre certified per link, power paths verified on both feeds, and failover tested by removing feeds, links or nodes under observation. Results are recorded live. A failing test stays failing until it is fixed and re-tested.

    • Certification results (native export)
    • Acceptance test report
    • Defect register with severity and owner

    All defects closed or formally accepted with residual risk in writing.

  7. 07

    Document

    Parallel

    As-builts, asset register, port maps, runbooks and the photo evidence that makes them believable.

    Documentation is written during the job, not reconstructed at the end — which is why our as-builts match what is actually in the hall. Formats follow your document structure if you have one.

    • As-built drawings (PDF + DWG)
    • Asset register with serials
    • Port map and cabling schedules
    • Runbooks

    Documentation reviewed by a second engineer before issue.

  8. 08

    Handover

    Go-live

    A walkthrough with your team, a signed acceptance pack, and field support already scoped for what comes next.

    We walk your operations team through what was built and how it is documented, transfer credentials and access properly, and agree the support model for the operating phase. Most projects move straight into a maintenance and field support agreement.

    • Signed acceptance pack
    • Knowledge transfer session
    • Support and SLA proposal

    Client acceptance signed; residual risks acknowledged in writing.

Coverage

Lisbon base.
Engineers where you build.

Crews mobilise from Lisbon, Frankfurt, London, Amsterdam and Warsaw across Europe, with regional teams in the UK, the United States and India.

Portugal — 4hGermany — 6hNetherlands — 6hSpain — 6hUnited Kingdom — 6hBelgium — 8hFrance — 8hIreland — 8hLuxembourg — 8hAustria — 10hItaly — 10hSwitzerland — 10hCzechia — 12hDenmark — 12hPoland — 12hHungary — 14hNorway — 14hSlovakia — 14hSweden — 14hFinland — 16hGreece — 16hRomania — 16hIceland — 20hIndia — 24hUnited States — 24hUnited Arab Emirates — 28hCanada — 30hSingapore — 30h

23 European countries · hubs in 7 cities

Fastest mobilisation

  • PortugalHQ4h
  • Germany6h
  • Netherlands6h
  • Spain6h
  • United Kingdom6h
  • Belgium8h
Full coverage map

Questions

What clients ask before the first project

If yours is not here, ask us directly — we would rather answer properly than send a brochure.

Do you only work in Europe?

Europe is our home market, with crews mobilising from Lisbon, Frankfurt, London, Amsterdam and Warsaw. We also deliver in the UK, the United States and India through regional teams, with travel time quoted per site before you commit.

Can you work under our standards and change control?

Yes, and we prefer it. Your rack standard, labelling scheme, change records and access procedures become our working method for the duration of the project.

Do you supply hardware and materials?

We can, from your approved vendor list, or install client-supplied equipment. Either way every item is checked in, serial-captured and reconciled against the packing list.

What does a handover pack contain?

As-built drawings, the asset register with serial numbers and U positions, port maps and cabling schedules, certification and acceptance test results, the defect register with closures, runbooks, and photographic evidence.

How quickly can you mobilise?

Quoted within four business hours for standard requests. Hub-site emergency remote hands typically mobilise inside two hours. Larger programmes are scheduled against a mobilisation plan agreed at the brief stage.

Are your engineers insured and vetted?

Yes. Public liability cover, background checks and site-specific inductions are completed before first access. Certifications and insurance documents are available on request.

Next step

Send us the hardware list.
We will send back a plan.

Tell us what needs building, where, and by when. You will get a scoped response within four business hours — including what we would do differently, if anything.

Quoted within 4 business hours. Emergency remote hands mobilised from the nearest hub.

01

Send the brief

Hardware list, drawings if you have them, site and deadline.

02

Scoped response

Within four business hours, with assumptions stated.

03

Survey & plan

Site visit or remote survey, then a plan you approve line by line.

04

Mobilise

Named crew, inducted and briefed before first access.